The Commonwealth’s “Energy Smarts” blog is featuring the Town of Sutton’s Simonian Center for Early Learning Solar PV project – a Cadmus-supported project. At 202 kW, Sutton’s PV system is one of the largest municipally owned PV systems in the state. Cadmus provided owner’s agent services to the Town of Sutton through a technical assistance grant from the Massachusetts Department of Energy Resources (DOER).

See the blog post here.

Cadmus assisted the town throughout the development process, helping the town identify the most advantageous contract for the sale of Solar Renewable Energy Credits (SRECs) generated by the system (SRECs are tradable credits that represent the “greenness” of the solar electricity generated). A Cadmus master electrician inspected the completed project for compliance with electric code, ensuring that the system is safe for staff, students, and visitors at the Simonian Center. Finally, Cadmus organized a “virtual ribbon cutting” on behalf of the Town to celebrate the successful completion of Sutton’s PV project.

Read Full Post »

Power Purchase Agreements (PPAs) are appealing to cities and towns for several reasons, and frequently because they require no upfront investment by the community. Rather, cost to the community (in addition to non-price factors) is the per kilowatt-hour (kWh) rate for electricity generated by the renewable energy system –the PPA rate. Different developers may propose significantly different PPA rates when responding to the same solicitation. However, PPA rates proposed that are noticeably lower than other bids received may be too good to be true. Inappropriate pricing can compromise the economic viability of these projects and increase risk to the community.

This diagram shows the relationship between parties in a typical, community-scale solar PPA in Massachusetts. Not all PPAs are structured in this manner.

When considering PPA price proposals, it is important to consider both the cost in cents per kilowatt-hour and how financeable the project is at the given PPA rate. PPA projects with PPA rate that is too low may suffer from significant delays as the developer seeks financing from financing parties looking for some return on their investment. Such delays and false starts waste the significant time investments that proponents make to introduce renewable generation in their communities.  In addition to lost momentum, incentives and other benefits (e.g., 30% U.S. Treasury Grant) that may be critical to a project’s economics may expire while the developer seeks financing.  Ultimately, if the developer is unable to secure financing, the project will likely fall apart.

 When examining PPA rates in cents per kilowatt-hour, bid evaluation teams should weigh the benefits of low PPA rates with potential risks:

  • Extremely low PPA rates and subsequent narrow margins can prevent conservative lenders from investing in the project.
  • In contract years 11 and beyond, the PPA rate should be high enough to fund operations and maintenance costs. That is, the PPA provider should have a financial incentive to continue to operate and maintain your system. PPA rates less than $0.02/kWh in years 11-20 should be considered cautiously.  If your community entered into such a contract, and the PPA provider abandoned the system, would your community be able to fund maintenance or decommissioning costs?

Low PPA rates may be workable in the context of large projects that will generate significant revenue for the developer, for example, through solar electricity sales to the community and SRECs. However, small and moderately sized projects –especially those with relatively high installed costs (e.g., lengthy interconnection runs, tree stumping required), may not be financeable at a low PPA rate.

Finally, many PPAs contain language that allows for developers to exit the contract prior to commercial operation if they are unable to find financing. Therefore, selecting a PPA rate that makes financial sense to your community, the developer, and their financing partners is important to helping all parties efficiently realize the benefits of renewable energy.

Read Full Post »

 DOER filed a report with the Massachusetts Department of Public Utilities outlining recommendations for utilities to improve the process of connecting new renewable energy generation installations to the electric grid. In its filing, DOER attached the Massachusetts Distributed Generation Interconnection Report which surveyed customers seeking interconnection in the state, researched policies in other states, interviewed utilities, and made specific recommendations about improving interconnection processes and policies.

The status of progress on these issues and scheduling for distributed generation (DG) workshops is available at the Massachusetts DG and Interconnection Website (http://bit.ly/MADGIC).

Read Full Post »

One of the main determinants of whether an RFP for a Power Purchase Agreement (PPA) will attract qualified developers and advantageous bids is estimated total potential capacity. If this information is not available, site area or rooftop square footage can serve as a proxy.

More Space. More Attention.

When conceiving of a renewable energy project, cities and towns should look to aggregate potential sites. Whether or not a PPA makes sense for the community will depend on the total amount of capacity that is feasible. For example, some PV developers require 500 kW of PV potential before proposing a solar PPA. Others will not pursue landfill solar projects that are smaller than two (2) MW. By aggregating as many rooftops and open spaces as possible in your project RFP, you will attract more vendors and capture economies of scale.

Whether conducting your own due diligence or investing in site assessments, your RFP should ultimately focus on quality sites. Buildings with aging roofs, for example, should be set aside for future phases. Those with many rooftop penetrations and little usable space should similarly be deferred.

 If publicly-owned buildings and open spaces are very limited, look elsewhere. Consider partnering with a neighboring municipality or other public entity in the region (e.g., schools, hospitals). This may be especially helpful where the potential partner has experience with renewable energy projects. Together, you may receive bids that neither could have attracted alone.

Read Full Post »

Are you building a new school or other public building? If your community is interested in incorporating solar photovoltaics (PV) into a new building project, but unable to do so at this time, specifying a “solar ready” roof will set you up for future success, because many of the modifications made to accomodate solar PV as a retrofit are low/no cost at the design phase. Preparing for solar PV during the building design phase maximizes PV capacity potential and significantly improves the economics of future solar development. Solar readiness should be discussed early in the building design phase; even high-performance green buildings are not always developed as solar ready buildings. 

Penetrations and obstructions on this high school's roof limit solar feasibility.

What is a solar ready roof?

A solar ready roof will have:

  • Sufficient load bearing capacity to accommodate future development of solar PV. A solar PV system typically adds an additional 2-7 pounds per square foot to building static loads, as well as potentially increasing wind-loading on the roof deck.
  • Significant roof area that is free of roof penetrations and obstructions, whereas a typical roof contains many scattered obstructions that impact solar feasibility. 
  • Pre-installed electrical infrastructure.  Running additional conduit to the roof is less expensive during construction than after the fact, and gives you the freedom to choose wiring paths, rather than being forced to, for example, install conduit along a building exterior.
What if my existing building is not solar ready?

Window washing anchors on this school's rooftop had the potential to limit PV capacity; however, the community elected to forego access to these anchors to maximize system size.

For those developing solar on existing buildings, it is important to consider access issues. For example, does the system design need to provide facilities managers with access to rooftop vent fans? If window-washing anchors are present on the roof, would the building owner be willing to forego access to these anchors and wash the building from ground level in order to take advantage of a much larger PV system?  

The DOE Solar America Communities program provides more information on how communities can promote solar readiness at homes, buildings, and developments on their website.

 

 

Read Full Post »

The fifth grade chorus sings their "Solar Song" to the tune of "Do Re Mi" at a ribbon cutting for the 200 kW Simonian Center system in Sutton, MA.

UPDATE: The Sutton Simonian Center PV project has been highlighted on the Commonwealth’s “Energy Smarts” blog.

Celebrating successful community renewable energy projects can be an important part of building support for your project. Communities with completed projects are often seen as leaders, and their success demonstrates the feasibility of these efforts.

Ribbon cutting events can be an exciting way to celebrate and share successful projects and lessons learned. The fifth grade chorus in Sutton made up their own “Solar Song” to perform at the ribbon cutting for the Simonian Center for Early Learning  200 kW municipally-owned solar PV system.

See their memorable performance online.

“Whacky Solar Panel Song” 
Sol, solar panels Sol-Sol Solar panels
[Do] Sometimes it takes a bit of dough
[Re] Absorbed on sunny sunny days
[Mi] We’re talking green energy
[Fa] The project went very fa (r)
Sol Solar panels whoa, whoa, whoa
[La] Lots of energy for everyone
[Ti] For the world community
[Do] So we’ll do some good and maybe change the world

 

Read Full Post »

Closed landfills are increasingly popular sites for community renewable energy projects.

The Department of Energy Resources (DOER) is expected to release a handbook on landfill solar PV in the upcoming months. This handbook is expected to include community-specific guidance on these increasingly popular projects.

For additional information on renewable energy at closed landfills, the Massachusetts Department of Environmental Protection (MassDEP) website currently hosts a number of resources.

Read Full Post »